Automation index
How much of a Furniture restorer’s job can AI already do?
A woodworm diagnosis comes earlier. Treating without overworking the piece do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Furniture restorer
19%
AI can already do 19% of this job.
#541 / 643
View rankingFurniture restorer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagnosis, woodworm and the proposal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Consolidate, glue and the one that opens.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Finish, shellac and the colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Hardware, upholstery and what is not touched.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The owner, the memory and not leaving it too new.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not overworking the piece, and signing the treatment.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- woodworm
- consolidate wood
- shellac
- hardware
- upholstery
- furniture diagnosis
- glue
- not overwork
Sources for this job· O*NET 51-7021.00· ESCO/ISCO 7522
IS WORK OVER?
Mason
15%
#627 / 643
View rankingMason
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read drawings, measure and order material.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 30% | +4.8 |
Setting out and levels on site.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Raise walls, render and plaster.EstimateNo public source provides a precise figure. This is our estimate. | 24% | 8% | +1.9 |
Floors, tiling and finishing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Safety, scaffolding and clearing the bay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Coordinate with foreman, plumber and electrician.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- build walls
- plaster
- site work
- Read drawings, measure and order material
- Setting out and levels on site
- Raise walls, render and plaster
- Floors, tiling and finishing
- Safety, scaffolding and clearing the bay
- albanil
- mason
Sources for this job· O*NET 47-2021.00· ESCO/ISCO 7112