Automation index
How much of a Furniture restorer’s job can AI already do?
A woodworm diagnosis comes earlier. Treating without overworking the piece do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Furniture restorer
19%
AI can already do 19% of this job.
#642 / 753
View rankingFurniture restorer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Diagnosis, woodworm and the proposal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Consolidate, glue and the one that opens.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Finish, shellac and the colour.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Hardware, upholstery and what is not touched.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The owner, the memory and not leaving it too new.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not overworking the piece, and signing the treatment.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- woodworm
- consolidate wood
- shellac
- hardware
- upholstery
- furniture diagnosis
- glue
- not overwork
Sources for this job· O*NET 51-7021.00· ESCO/ISCO 7522
IS WORK OVER?
Power engineer
22%
#401 / 753
View rankingPower engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Study, the short-circuit and selectivity.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Substation, the disconnector and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Switching, the five rules and not skipping them.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Fault, the relay and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not blow, and not working live.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- short-circuits
- selectivity
- disconnectors
- five rules
- relays
- substations
- lockouts
- not work live
Sources for this job· O*NET 17-2071.00· ESCO/ISCO 2151