Automation index
How much of a Game designer’s job can AI already do?
A GDD and an economy table come earlier. Playing it until it hurts, and cutting a system, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Game designer
26%
AI can already do 26% of this job.
#199 / 633
View rankingGame designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
GDD, flows and economy tables.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Leveling, quests and tutorial copy.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Playtest, telemetry and reading frustration.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Align art, engineering and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Cut systems and defend the feel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Decide what the game is, and is not.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design interfaces
- prototypes
- figma
- GDD, flows and economy tables
- Leveling, quests and tutorial copy
- Align art, engineering and production
- Cut systems and defend the feel
- Decide what the game is, and is not
- game designer
- diseñador de videojuegos
Sources for this job· O*NET 15-1255.00· ESCO/ISCO 2166
IS WORK OVER?
Electrician
24%↑
#265 / 633
View rankingElectrician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Use a variety of tools or equipment, such as power construction equipment, measuring devices, power tools, and testing equipment, such as oscilloscopes, ammeters, or test lamps.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 28% | +2.8 |
Work from ladders, scaffolds, or roofs to install, maintain, or repair electrical wiring, equipment, or fixtures.EstimateNo public source provides a precise figure. This is our estimate. | 10% | 12% | +1.2 |
Prepare sketches or follow blueprints to determine the location of wiring or equipment and to ensure conformance to building and safety codes.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Assemble, install, test, or maintain electrical or electronic wiring, equipment, appliances, apparatus, or fixtures, using hand tools or power tools.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Place conduit, pipes, or tubing, inside designated partitions, walls, or other concealed areas, and pull insulated wires or cables through the conduit to complete circuits between boxes.EstimateNo public source provides a precise figure. This is our estimate. | 8% | 28% | +2.2 |
Direct or train workers to install, maintain, or repair electrical wiring, equipment, or fixtures.EstimateNo public source provides a precise figure. This is our estimate. | 6% | 12% | +0.7 |
Inspect electrical systems, equipment, or components to identify hazards, defects, or the need for adjustment or repair, and to ensure compliance with codes.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 12% | +0.6 |
Perform physically demanding tasks, such as digging trenches to lay conduit or moving or lifting heavy objects.EstimateNo public source provides a precise figure. This is our estimate. | 5% | 12% | +0.6 |
Other less frequent tasks (weight estimated from frequency).EstimateNo public source provides a precise figure. This is our estimate. | 40% | 28% | +11.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- install wiring
- electrical panels
- repair faults
- building systems monitoring technology
- electricity
- work ergonomically
- resolve equipment malfunctions
- inspect electrical supplies
- splice cable
- inspect construction supplies
Sources for this job· O*NET 47-2111.00· ESCO/ISCO 7411