Automation index
How much of a Game designer’s job can AI already do?
A GDD and an economy table come earlier. Playing it until it hurts, and cutting a system, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Game designer
26%
AI can already do 26% of this job.
#199 / 633
View rankingGame designer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
GDD, flows and economy tables.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Leveling, quests and tutorial copy.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Playtest, telemetry and reading frustration.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Align art, engineering and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Cut systems and defend the feel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Decide what the game is, and is not.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 26% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- design interfaces
- prototypes
- figma
- GDD, flows and economy tables
- Leveling, quests and tutorial copy
- Align art, engineering and production
- Cut systems and defend the feel
- Decide what the game is, and is not
- game designer
- diseñador de videojuegos
Sources for this job· O*NET 15-1255.00· ESCO/ISCO 2166
IS WORK OVER?
Miller
22%
#355 / 633
View rankingMiller
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Wheat, moisture and the diagram.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Mill, sift and the one that heats.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Quality, ash and the baker who complains.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cleaning, pests and the silo.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The harvest, the batch and not mixing the wet.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Regular flour, and not scorching the grain.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- mill wheat
- sift
- grain moisture
- ash
- silos
- mill pests
- mill diagrams
- flour batches
Sources for this job· O*NET 51-9021.00· ESCO/ISCO 8160