IS WORK OVER?

Automation index

How much of a Game designer’s job can AI already do?

A GDD and an economy table come earlier. Playing it until it hurts, and cutting a system, do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Game designer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
GDD, flows and economy tables.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Leveling, quests and tutorial copy.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Playtest, telemetry and reading frustration.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Align art, engineering and production.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Cut systems and defend the feel.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Decide what the game is, and is not.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • design interfaces
  • prototypes
  • figma
  • GDD, flows and economy tables
  • Leveling, quests and tutorial copy
  • Align art, engineering and production
  • Cut systems and defend the feel
  • Decide what the game is, and is not
  • game designer
  • diseñador de videojuegos

Sources for this job· O*NET 15-1255.00· ESCO/ISCO 2166

SCADA technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Screen, tags and the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the PLC and the one that will not answer.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Historian, the gap and not dressing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Network, the port and not leaving it open.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The shift, the doubt and not hiding the alarm.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they see the alarm, and not dressing the historian.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • SCADA screens
  • alarms
  • historian
  • tags
  • ports
  • field PLC
  • not leave ports open
  • shifts

Sources for this job· O*NET 15-1244.00· ESCO/ISCO 3114

Analyse my job

Jobs with similar scores

  1. 232Financial controller26%
  2. 233Drafter26%
  3. 234Web developer26%
  4. 236Set designer26%
  5. 237Statistician26%
  6. 238Cultural manager26%