Automation index
How much of a Gas fitter’s job can AI already do?
A schematic and a certificate come earlier. No smell of gas when you close up does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Gas fitter
18%
AI can already do 18% of this job.
#677 / 743
View rankingGas fitter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Schematics, materials and certificates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Run, thread and pressure-test.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Appliances, flues and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Client, utility and legalisation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Faults, leaks and call-outs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not leaving a home with a leak.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Schematics, materials and certificates
- Run, thread and pressure-test
- Appliances, flues and ventilation
- Client, utility and legalisation
- Faults, leaks and call-outs
- Not leaving a home with a leak
- instalador de gas
- gas fitter
Sources for this job· O*NET 47-2152.00· ESCO/ISCO 7126
IS WORK OVER?
Bridge engineer
22%
#391 / 743
View rankingBridge engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, loads and the span.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Works, the prestress and the one who did not tension.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Inspection, the crack and not looking away.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Traffic, the closure and not leaving the village hanging.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it takes the lorry, and not signing the crack.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- spans
- prestress
- cracks
- bridge inspection
- loads
- traffic closures
- structural models
- tensioning
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142