Automation index
How much of a Gas fitter’s job can AI already do?
A schematic and a certificate come earlier. No smell of gas when you close up does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Gas fitter
18%
AI can already do 18% of this job.
#567 / 633
View rankingGas fitter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Schematics, materials and certificates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Run, thread and pressure-test.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Appliances, flues and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Client, utility and legalisation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Faults, leaks and call-outs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not leaving a home with a leak.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Schematics, materials and certificates
- Run, thread and pressure-test
- Appliances, flues and ventilation
- Client, utility and legalisation
- Faults, leaks and call-outs
- Not leaving a home with a leak
- instalador de gas
- gas fitter
Sources for this job· O*NET 47-2152.00· ESCO/ISCO 7126
IS WORK OVER?
Database administrator
28%
#76 / 633
View rankingDatabase administrator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Tuning, indexes and execution plans.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 48% | +10.6 |
Backups, jobs and docs.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 42% | +7.6 |
Incidents, locks and restores.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 20% | +3.2 |
Schema changes with development.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Permissions, audit and PII.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Capacity, cost and engine choice.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Tuning, indexes and execution plans
- Backups, jobs and docs
- Incidents, locks and restores
- Schema changes with development
- Permissions, audit and PII
- Capacity, cost and engine choice
- dba
- administrador de base de datos
- oracle dba
Sources for this job· O*NET 15-1242.00· ESCO/ISCO 2521