Automation index
How much of a Gas fitter’s job can AI already do?
A schematic and a certificate come earlier. No smell of gas when you close up does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Gas fitter
18%
AI can already do 18% of this job.
#577 / 643
View rankingGas fitter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Schematics, materials and certificates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Run, thread and pressure-test.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Appliances, flues and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Client, utility and legalisation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Faults, leaks and call-outs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not leaving a home with a leak.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Schematics, materials and certificates
- Run, thread and pressure-test
- Appliances, flues and ventilation
- Client, utility and legalisation
- Faults, leaks and call-outs
- Not leaving a home with a leak
- instalador de gas
- gas fitter
Sources for this job· O*NET 47-2152.00· ESCO/ISCO 7126
IS WORK OVER?
Power-plant operator
19%
#527 / 643
View rankingPower-plant operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-point, parameters and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Room, alarms and the one that trips.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Start, stop and not skipping the SOP.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Maintenance, isolation and the permit.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The peak, the grid and not forcing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
The set-point, and not tripping.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- set-points
- control room
- plant SOP
- starts
- isolations
- alarms
- dispatch
- the grid
Sources for this job· O*NET 51-8013.00· ESCO/ISCO 3131