Automation index
How much of a Gas fitter’s job can AI already do?
A schematic and a certificate come earlier. No smell of gas when you close up does not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Gas fitter
18%
AI can already do 18% of this job.
#577 / 643
View rankingGas fitter
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Schematics, materials and certificates.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Run, thread and pressure-test.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Appliances, flues and ventilation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
Client, utility and legalisation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Faults, leaks and call-outs.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Not leaving a home with a leak.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Schematics, materials and certificates
- Run, thread and pressure-test
- Appliances, flues and ventilation
- Client, utility and legalisation
- Faults, leaks and call-outs
- Not leaving a home with a leak
- instalador de gas
- gas fitter
Sources for this job· O*NET 47-2152.00· ESCO/ISCO 7126
IS WORK OVER?
Soldier
14%
#638 / 643
View rankingSoldier
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Logs, written orders and paper logistics.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Classroom drill and simulators.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 22% | +3.1 |
Physical drill, weapons and field.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 6% | +1.3 |
Operations, watch and deployment.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 8% | +1.4 |
Unit life, discipline and comrades.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 10% | +1.6 |
Command or be commanded in a real incident.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 14% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Logs, written orders and paper logistics
- Classroom drill and simulators
- Physical drill, weapons and field
- Operations, watch and deployment
- Unit life, discipline and comrades
- Command or be commanded in a real incident
- militar
- soldado
- soldier
- ejercito
Sources for this job· O*NET 55-1011.00· ESCO/ISCO 0110