Automation index
How much of a Gastroenterologist’s job can AI already do?
A colonoscopy report comes earlier. Putting the scope in and not perforating do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Gastroenterologist
22%
AI can already do 22% of this job.
#352 / 633
View rankingGastroenterologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read endoscopies, labs and the transit study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Colonoscopy, gastroscopy and ERCP.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
IBD, hepatitis and reflux plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Abdomen clinic, occult blood and the fear of cancer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
GI emergencies and the bleed that does not stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Consent, perforation and signing the procedure.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- do colonoscopies
- gastroscopy
- treat IBD
- ERCP
- GI clinic
- hepatitis plans
- GI bleed
- read endoscopies
Sources for this job· O*NET 29-1216.00· ESCO/ISCO 2212
IS WORK OVER?
Aerospace engineer
25%
#228 / 633
View rankingAerospace engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Calculate, simulate and certify structures and systems.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Drawings, tolerances and traceability.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bench, test flight and incidents.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Vendors, quality and EASA.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Documentation, versions and configuration.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Sign something that will not fall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Drawings, tolerances and traceability
- Bench, test flight and incidents
- Vendors, quality and EASA
- Documentation, versions and configuration
- Sign something that will not fall
- ingeniero aeronautico
- aerospace engineer
Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144