Automation index
How much of a Gastroenterologist’s job can AI already do?
A colonoscopy report comes earlier. Putting the scope in and not perforating do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Gastroenterologist
22%
AI can already do 22% of this job.
#360 / 643
View rankingGastroenterologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read endoscopies, labs and the transit study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Colonoscopy, gastroscopy and ERCP.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
IBD, hepatitis and reflux plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Abdomen clinic, occult blood and the fear of cancer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
GI emergencies and the bleed that does not stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Consent, perforation and signing the procedure.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- do colonoscopies
- gastroscopy
- treat IBD
- ERCP
- GI clinic
- hepatitis plans
- GI bleed
- read endoscopies
Sources for this job· O*NET 29-1216.00· ESCO/ISCO 2212
IS WORK OVER?
CNC machinist
24%
#280 / 643
View rankingCNC machinist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Program, simulate and document the cycle.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 45% | +9 |
Work orders, paper metrology and batches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Set up, set zeros and start.EstimateNo public source provides a precise figure. This is our estimate. | 20% | 14% | +2.8 |
Measure, adjust and not break a tool.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Maintenance, swarf and safety.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 16% | +2.2 |
Talk to engineering when the drawing lies.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Program, simulate and document the cycle
- Work orders, paper metrology and batches
- Set up, set zeros and start
- Measure, adjust and not break a tool
- Maintenance, swarf and safety
- Talk to engineering when the drawing lies
- cnc
- operario cnc
- fresador
- tornero cnc
Sources for this job· O*NET 51-4041.00· ESCO/ISCO 7223