Automation index
How much of a Gastroenterologist’s job can AI already do?
A colonoscopy report comes earlier. Putting the scope in and not perforating do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Gastroenterologist
22%
AI can already do 22% of this job.
#422 / 753
View rankingGastroenterologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read endoscopies, labs and the transit study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Colonoscopy, gastroscopy and ERCP.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
IBD, hepatitis and reflux plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Abdomen clinic, occult blood and the fear of cancer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
GI emergencies and the bleed that does not stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Consent, perforation and signing the procedure.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- do colonoscopies
- gastroscopy
- treat IBD
- ERCP
- GI clinic
- hepatitis plans
- GI bleed
- read endoscopies
Sources for this job· O*NET 29-1216.00· ESCO/ISCO 2212
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165