Automation index
How much of a Gastroenterologist’s job can AI already do?
A colonoscopy report comes earlier. Putting the scope in and not perforating do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Gastroenterologist
22%
AI can already do 22% of this job.
#352 / 633
View rankingGastroenterologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Read endoscopies, labs and the transit study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 48% | +7.7 |
Colonoscopy, gastroscopy and ERCP.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
IBD, hepatitis and reflux plans.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Abdomen clinic, occult blood and the fear of cancer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
GI emergencies and the bleed that does not stop.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Consent, perforation and signing the procedure.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- do colonoscopies
- gastroscopy
- treat IBD
- ERCP
- GI clinic
- hepatitis plans
- GI bleed
- read endoscopies
Sources for this job· O*NET 29-1216.00· ESCO/ISCO 2212
IS WORK OVER?
Industrial engineer
28%
#102 / 633
View rankingIndustrial engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model processes, balances and a first plant layout.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 45% | +9.9 |
Draft procedures, PFDs and operating instructions.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 40% | +7.2 |
Analyse cost, bottlenecks and OEE from data.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Coordinate suppliers, maintenance and production.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Commissioning and plant trials.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Capex calls and industrial-safety liability.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 28% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Commissioning and plant trials
- ingeniero industrial
- industrial engineer
- procesos industriales
Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141