Automation index
How much of a Geneticist’s job can AI already do?
A panel comes earlier. Reading the variant and talking to the family do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geneticist
27%
AI can already do 27% of this job.
#154 / 623
View rankingGeneticist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Panel, variants and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Clinic, the pedigree and the family.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
VUS, the doubt and not scaring extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Lab, the sample and the one that is not enough.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The clinician, the treatment and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Read it, and talking to the family.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- genetic panels
- variants
- pedigree
- VUS
- genetic reports
- samples
- genetics clinic
- not scare
Sources for this job· O*NET 19-1029.00· ESCO/ISCO 2131
IS WORK OVER?
Civil engineer
25%
#231 / 623
View rankingCivil engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Structural calcs and code checks.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 42% | +9.2 |
Drawings, quantities and cost estimate.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 38% | +6.8 |
Geotech and simplified impact reports.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Coordination with contractor, council and suppliers.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 15% | +2.4 |
Site execution and safety control.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Site authority and responsible signature.EstimateNo public source provides a precise figure. This is our estimate. | 12% | 10% | +1.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Structural calcs and code checks
- Drawings, quantities and cost estimate
- Geotech and simplified impact reports
- Site execution and safety control
- Site authority and responsible signature
- ingeniero civil
- civil engineer
- obras publicas
- caminos
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142