Automation index
How much of a Geneticist’s job can AI already do?
A panel comes earlier. Reading the variant and talking to the family do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geneticist
27%
AI can already do 27% of this job.
#165 / 753
View rankingGeneticist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Panel, variants and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Clinic, the pedigree and the family.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
VUS, the doubt and not scaring extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Lab, the sample and the one that is not enough.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The clinician, the treatment and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Read it, and talking to the family.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- genetic panels
- variants
- pedigree
- VUS
- genetic reports
- samples
- genetics clinic
- not scare
Sources for this job· O*NET 19-1029.00· ESCO/ISCO 2131
IS WORK OVER?
Gas network engineer
22%
#397 / 753
View rankingGas network engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Model, pressures and the diameter.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Trench, the weld and the one that was not x-rayed.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Leak, the detector and getting people out.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Cut, the bypass and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the rush and not covering without testing.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the trench does not go up, and not leaving them without gas.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- network pressures
- diameters
- trenches
- gas welds
- leaks
- detectors
- bypass
- x-rays
Sources for this job· O*NET 17-2171.00· ESCO/ISCO 2145