Automation index
How much of a Geneticist’s job can AI already do?
A panel comes earlier. Reading the variant and talking to the family do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geneticist
27%
AI can already do 27% of this job.
#154 / 623
View rankingGeneticist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Panel, variants and the report.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Clinic, the pedigree and the family.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
VUS, the doubt and not scaring extra.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Lab, the sample and the one that is not enough.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The clinician, the treatment and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Read it, and talking to the family.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- genetic panels
- variants
- pedigree
- VUS
- genetic reports
- samples
- genetics clinic
- not scare
Sources for this job· O*NET 19-1029.00· ESCO/ISCO 2131
IS WORK OVER?
Hydraulic engineer
27%
#164 / 623
View rankingHydraulic engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Hydrology, flows and the floodplain model.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Field, section and what LiDAR misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Drainage works, pumps and the outfall.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Water permits and the river authority.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The flood, the village and the yes to the channel.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
That it does not flood, and not trusting the model alone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- model floodplains
- flows
- drainage
- channel works
- water permits
- pumps
- channel sections
- river authority
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142