Automation index
How much of a Geological engineer’s job can AI already do?
A borehole and a 3D model come earlier. Calling whether you can found there do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geological engineer
25%
AI can already do 25% of this job.
#243 / 643
View rankingGeological engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Boreholes, lab and the geotech profile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Field, outcrop and what the map misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Foundations, slopes and the risk report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Tunnel, water and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The works that move, and stop or go.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Call the ground, and sign the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- geotech profile
- foundations
- slopes
- tunnel support
- outcrops
- geological risk
- ground reports
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Battery technician
19%
#547 / 643
View rankingBattery technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
BMS, SOH and the log.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Module, the imbalance and the one that swells.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Shop, isolation and not shorting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Thermal, the fire and the protocol.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The vehicle, the warranty and not swapping blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No fire, and the module right.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- BMS
- SOH
- modules
- imbalance
- swelling
- isolation
- thermal fire
- battery warranty
Sources for this job· O*NET 17-3023.00· ESCO/ISCO 3113