Automation index
How much of a Geological engineer’s job can AI already do?
A borehole and a 3D model come earlier. Calling whether you can found there do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geological engineer
25%
AI can already do 25% of this job.
#238 / 623
View rankingGeological engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Boreholes, lab and the geotech profile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Field, outcrop and what the map misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Foundations, slopes and the risk report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Tunnel, water and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The works that move, and stop or go.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Call the ground, and sign the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- geotech profile
- foundations
- slopes
- tunnel support
- outcrops
- geological risk
- ground reports
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Camera operator
18%
#546 / 623
View rankingCamera operator
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Schedule, lists and overlays.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Frame, follow and not lose focus.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Kit, cards and backups.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Director, light and sound.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Knees, shoulder and long days.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Not wiping a full card.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Schedule, lists and overlays
- Frame, follow and not lose focus
- Kit, cards and backups
- Director, light and sound
- Knees, shoulder and long days
- Not wiping a full card
- camara
- operador de camara
- camera operator
Sources for this job· O*NET 27-4031.00· ESCO/ISCO 3521