Automation index
How much of a Geological engineer’s job can AI already do?
A borehole and a 3D model come earlier. Calling whether you can found there do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geological engineer
25%
AI can already do 25% of this job.
#238 / 623
View rankingGeological engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Boreholes, lab and the geotech profile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Field, outcrop and what the map misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Foundations, slopes and the risk report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Tunnel, water and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The works that move, and stop or go.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Call the ground, and sign the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- geotech profile
- foundations
- slopes
- tunnel support
- outcrops
- geological risk
- ground reports
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Concrete finisher
19%
#515 / 623
View rankingConcrete finisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, joints and thickness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Pour, vibrate and float.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Screed, power float and the right moment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cure, polythene and the windy day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The late mixer and the one who wants water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not crack open, and not adding extra water.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pour concrete
- vibrate
- float
- shrinkage joints
- power float
- cure
- screed
- slab thickness
Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114