IS WORK OVER?

Automation index

How much of a Geological engineer’s job can AI already do?

A borehole and a 3D model come earlier. Calling whether you can found there do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Geological engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Boreholes, lab and the geotech profile.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Field, outcrop and what the map misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Foundations, slopes and the risk report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Tunnel, water and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The works that move, and stop or go.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Call the ground, and sign the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • geotech profile
  • foundations
  • slopes
  • tunnel support
  • outcrops
  • geological risk
  • ground reports

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Dosimetrist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
CT, contours and the plan.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Organ at risk, the curve and not overshooting.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Physics, the check and the one that does not fit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Fraction, the setup and the patient who is not the same.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The oncologist, the trade-off and not signing blind.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The tumour gets it, and the healthy organ does not.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • dose plans
  • contours
  • organs at risk
  • dosimetry check
  • fractions
  • setup
  • sim CT
  • DVH curves

Sources for this job· O*NET 29-2036.00· ESCO/ISCO 3211

Analyse my job

Jobs with similar scores

  1. 240Telecom engineer25%
  2. 241Electrical engineer25%
  3. 242Electronics engineer25%
  4. 244Mechanical engineer25%
  5. 245Naval architect25%
  6. 246Chemical engineer25%