Automation index
How much of a Geological engineer’s job can AI already do?
A borehole and a 3D model come earlier. Calling whether you can found there do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geological engineer
25%
AI can already do 25% of this job.
#238 / 633
View rankingGeological engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Boreholes, lab and the geotech profile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Field, outcrop and what the map misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Foundations, slopes and the risk report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Tunnel, water and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The works that move, and stop or go.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Call the ground, and sign the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- geotech profile
- foundations
- slopes
- tunnel support
- outcrops
- geological risk
- ground reports
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Inside sales
27%
#143 / 633
View rankingInside sales
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Cadence, list and the call.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Demo, objections and the one who does not answer.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
CRM, the next step and not inflating the pipeline.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The SDR, the handoff and not fighting the lead.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The month, the quota and not discounting extra.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Close without a visit, and that they pick up.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- cadences
- demos
- pipeline
- next step
- quota
- SDR
- objections
- cold calls
Sources for this job· O*NET 41-3091.00· ESCO/ISCO 2433