IS WORK OVER?

Automation index

How much of a Geological engineer’s job can AI already do?

A borehole and a 3D model come earlier. Calling whether you can found there do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Geological engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Boreholes, lab and the geotech profile.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Field, outcrop and what the map misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Foundations, slopes and the risk report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Tunnel, water and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The works that move, and stop or go.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Call the ground, and sign the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • geotech profile
  • foundations
  • slopes
  • tunnel support
  • outcrops
  • geological risk
  • ground reports

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Last-mile manager

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Zones, capacity and route cuts.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
KPIs, first attempt and incidents.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
The courier, the lobby and the one who will not open.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Peaks, rain and hiring too many or too few.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The angry customer and not dressing delivered.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
Cover the peak, and not leaving the neighbourhood orphaned.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%26%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • delivery zones
  • first attempt
  • delivery KPIs
  • last-mile peaks
  • lobbies
  • delivery incidents
  • courier capacity
  • cut routes

Sources for this job· O*NET 11-3071.00· ESCO/ISCO 1324

Analyse my job

Jobs with similar scores

  1. 235Telecom engineer25%
  2. 236Electrical engineer25%
  3. 237Electronics engineer25%
  4. 239Mechanical engineer25%
  5. 240Naval architect25%
  6. 241Chemical engineer25%