Automation index
How much of a Geological engineer’s job can AI already do?
A borehole and a 3D model come earlier. Calling whether you can found there do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geological engineer
25%
AI can already do 25% of this job.
#238 / 633
View rankingGeological engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Boreholes, lab and the geotech profile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Field, outcrop and what the map misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Foundations, slopes and the risk report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Tunnel, water and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The works that move, and stop or go.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Call the ground, and sign the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- geotech profile
- foundations
- slopes
- tunnel support
- outcrops
- geological risk
- ground reports
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Meteorologist
25%
#246 / 633
View rankingMeteorologist
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Models, maps and a first forecast.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Observation, sondes and satellite.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Warnings, civil protection and media.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Shift, uncertainty and not over-scaring.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Verification, archives and research.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Not sitting on a warning that saves someone.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Models, maps and a first forecast
- Observation, sondes and satellite
- Warnings, civil protection and media
- Shift, uncertainty and not over-scaring
- Verification, archives and research
- meteorologo
Sources for this job· O*NET 19-2021.00· ESCO/ISCO 2112