Automation index
How much of a Geological engineer’s job can AI already do?
A borehole and a 3D model come earlier. Calling whether you can found there do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geological engineer
25%
AI can already do 25% of this job.
#238 / 633
View rankingGeological engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Boreholes, lab and the geotech profile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Field, outcrop and what the map misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Foundations, slopes and the risk report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Tunnel, water and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The works that move, and stop or go.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Call the ground, and sign the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- geotech profile
- foundations
- slopes
- tunnel support
- outcrops
- geological risk
- ground reports
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Mixer-truck driver
21%
#412 / 633
View rankingMixer-truck driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Order, mix and mixing time.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Drive, site and the tight access.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Pour, pump and the one who wants more water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Wash, leftovers and not leaving a hard drum.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The jam, the delay and the concrete that sets.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Arrive fresh, and not adding extra water.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 21% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive mixers
- batch
- pour concrete
- wash the drum
- slump
- concrete pump
- mix order
- site access
Sources for this job· O*NET 53-3032.00· ESCO/ISCO 8332