Automation index
How much of a Geological engineer’s job can AI already do?
A borehole and a 3D model come earlier. Calling whether you can found there do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geological engineer
25%
AI can already do 25% of this job.
#265 / 713
View rankingGeological engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Boreholes, lab and the geotech profile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Field, outcrop and what the map misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Foundations, slopes and the risk report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Tunnel, water and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The works that move, and stop or go.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Call the ground, and sign the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- geotech profile
- foundations
- slopes
- tunnel support
- outcrops
- geological risk
- ground reports
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Non-commissioned officer
22%
#435 / 713
View rankingNon-commissioned officer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Drill, the trade and the sheet.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Barracks, the one who is late and the one who skives.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Guard, the weapon and not sleeping it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Field, the mistake and not humiliating in public.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The officer, the order and not leaving the troops hanging.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That they know the trade, and not humiliating.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drill
- barracks
- guards
- weapons
- sheets
- the troops
- not humiliate
- the military trade
Sources for this job· O*NET 55-1017.00· ESCO/ISCO 0110