IS WORK OVER?

Automation index

How much of a Geological engineer’s job can AI already do?

A borehole and a 3D model come earlier. Calling whether you can found there do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Geological engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Boreholes, lab and the geotech profile.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Field, outcrop and what the map misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Foundations, slopes and the risk report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Tunnel, water and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The works that move, and stop or go.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Call the ground, and sign the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • geotech profile
  • foundations
  • slopes
  • tunnel support
  • outcrops
  • geological risk
  • ground reports

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Non-commissioned officer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Drill, the trade and the sheet.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Barracks, the one who is late and the one who skives.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Guard, the weapon and not sleeping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Field, the mistake and not humiliating in public.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The officer, the order and not leaving the troops hanging.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That they know the trade, and not humiliating.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • drill
  • barracks
  • guards
  • weapons
  • sheets
  • the troops
  • not humiliate
  • the military trade

Sources for this job· O*NET 55-1017.00· ESCO/ISCO 0110

Analyse my job

Jobs with similar scores

  1. 262Telecom engineer25%
  2. 263Electrical engineer25%
  3. 264Electronics engineer25%
  4. 266Mechanical engineer25%
  5. 267Naval architect25%
  6. 268Chemical engineer25%