IS WORK OVER?

Automation index

How much of a Geological engineer’s job can AI already do?

A borehole and a 3D model come earlier. Calling whether you can found there do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Geological engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Boreholes, lab and the geotech profile.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Field, outcrop and what the map misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Foundations, slopes and the risk report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Tunnel, water and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The works that move, and stop or go.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Call the ground, and sign the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • geotech profile
  • foundations
  • slopes
  • tunnel support
  • outcrops
  • geological risk
  • ground reports

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

QA automation engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Test, the selector and the flake.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Pipeline, the green and the one that lies.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Bug, the repro and not closing it blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Data, the environment and not sharing prod.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The developer, the rush and not skipping the one that fails.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Catch the bug, and not painting a lying green.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • automated tests
  • selectors
  • flakes
  • QA pipelines
  • repro
  • environments
  • lying green
  • debug tests

Sources for this job· O*NET 15-1253.00· ESCO/ISCO 2519

Analyse my job

Jobs with similar scores

  1. 281Telecom engineer25%
  2. 282Electrical engineer25%
  3. 283Electronics engineer25%
  4. 285Mechanical engineer25%
  5. 286Naval architect25%
  6. 287Chemical engineer25%