IS WORK OVER?

Automation index

How much of a Geological engineer’s job can AI already do?

A borehole and a 3D model come earlier. Calling whether you can found there do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Geological engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Boreholes, lab and the geotech profile.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Field, outcrop and what the map misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Foundations, slopes and the risk report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Tunnel, water and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The works that move, and stop or go.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Call the ground, and sign the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • geotech profile
  • foundations
  • slopes
  • tunnel support
  • outcrops
  • geological risk
  • ground reports

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Reliability engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Data, MTBF and the Pareto.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Failure, the cause and not patching twice.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Spare, the critical and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
RCM, the plan and the one that is not done.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Production, the rush and not running the tired one.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not drop at three, and not hiding the spare.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • MTBF
  • Pareto
  • root causes
  • critical spares
  • RCM
  • failures
  • maintenance plans
  • not patch twice

Sources for this job· O*NET 17-2112.00· ESCO/ISCO 2141

Analyse my job

Jobs with similar scores

  1. 269Telecom engineer25%
  2. 270Electrical engineer25%
  3. 271Electronics engineer25%
  4. 273Mechanical engineer25%
  5. 274Naval architect25%
  6. 275Chemical engineer25%