Automation index
How much of a Geological engineer’s job can AI already do?
A borehole and a 3D model come earlier. Calling whether you can found there do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geological engineer
25%
AI can already do 25% of this job.
#253 / 683
View rankingGeological engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Boreholes, lab and the geotech profile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Field, outcrop and what the map misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Foundations, slopes and the risk report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Tunnel, water and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The works that move, and stop or go.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Call the ground, and sign the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- geotech profile
- foundations
- slopes
- tunnel support
- outcrops
- geological risk
- ground reports
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Residential youth worker
19%
#535 / 683
View rankingResidential youth worker
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Shift, the sheet and the group.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Spike, the hold and not humiliating.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Night, the abscond and calling it in.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Court, the report and not dressing it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The family, the visit and not taking sides.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Be there at the spike, and that they do not get hurt.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- incident sheets
- holds
- absconds
- court reports
- residential shifts
- family visits
- not humiliate
- the group
Sources for this job· O*NET 21-1093.00· ESCO/ISCO 2635