IS WORK OVER?

Automation index

How much of a Geological engineer’s job can AI already do?

A borehole and a 3D model come earlier. Calling whether you can found there do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Geological engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Boreholes, lab and the geotech profile.
Estimate

No public source provides a precise figure. This is our estimate.

16%44%+7
Field, outcrop and what the map misses.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Foundations, slopes and the risk report.
Estimate

No public source provides a precise figure. This is our estimate.

16%36%+5.8
Tunnel, water and the support.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The works that move, and stop or go.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Call the ground, and sign the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • geotech profile
  • foundations
  • slopes
  • tunnel support
  • outcrops
  • geological risk
  • ground reports

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Site engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Setting-out, axes and the level.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Rebar, cover and the one that is missing.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Concrete, the slump and not pouring if it fails.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Note, the diary and not dressing the delay.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The site manager, the rush and not covering bad steel.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
That the column is there, and not covering the steel.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • setting-out
  • axes
  • rebar
  • cover
  • slump
  • site diary
  • levels
  • not cover steel

Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142

Analyse my job

Jobs with similar scores

  1. 271Telecom engineer25%
  2. 272Electrical engineer25%
  3. 273Electronics engineer25%
  4. 275Mechanical engineer25%
  5. 276Naval architect25%
  6. 277Chemical engineer25%