Automation index
How much of a Geological engineer’s job can AI already do?
A borehole and a 3D model come earlier. Calling whether you can found there do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geological engineer
25%
AI can already do 25% of this job.
#238 / 633
View rankingGeological engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Boreholes, lab and the geotech profile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Field, outcrop and what the map misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Foundations, slopes and the risk report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Tunnel, water and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The works that move, and stop or go.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Call the ground, and sign the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- geotech profile
- foundations
- slopes
- tunnel support
- outcrops
- geological risk
- ground reports
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Veterinary technician
18%
#584 / 633
View rankingVeterinary technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Charts, bookings and drug stock.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hold, place lines and assist in theatre.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 10% | +2.2 |
Labs, X-rays and samples.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Talk to owners and explain discharge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cages, cleaning and hospitalisation.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 16% | +2.6 |
Bites, zoonoses and not leaving an animal.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 14% | +2 |
| Total | 100% | 18% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- Charts, bookings and drug stock
- Hold, place lines and assist in theatre
- Labs, X-rays and samples
- Talk to owners and explain discharge
- Cages, cleaning and hospitalisation
- Bites, zoonoses and not leaving an animal
- tecnico veterinario
- auxiliar veterinario
- vet tech
Sources for this job· O*NET 29-2056.00· ESCO/ISCO 3240