Automation index
How much of a Geological engineer’s job can AI already do?
A borehole and a 3D model come earlier. Calling whether you can found there do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geological engineer
25%
AI can already do 25% of this job.
#238 / 633
View rankingGeological engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Boreholes, lab and the geotech profile.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 44% | +7 |
Field, outcrop and what the map misses.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 16% | +2.9 |
Foundations, slopes and the risk report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 36% | +5.8 |
Tunnel, water and the support.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The works that move, and stop or go.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Call the ground, and sign the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 25% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- geotech profile
- foundations
- slopes
- tunnel support
- outcrops
- geological risk
- ground reports
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146
IS WORK OVER?
Warehouse supervisor
24%
#270 / 633
View rankingWarehouse supervisor
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Docks, waves and the shift plan.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
The team, the peak and the one who cannot keep up.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Stock, shrink and the mystery gap.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Safety, forklifts and the near miss.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The late haulier and not mixing the docks.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
Get the shift out, and not mixing the goods.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 14% | +2.2 |
| Total | 100% | 24% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- plan docks
- waves
- warehouse shift
- shrink
- forklifts
- near misses
- outbound peaks
- mixed goods
Sources for this job· O*NET 53-1048.00· ESCO/ISCO 1324