IS WORK OVER?

Automation index

How much of a Geologist’s job can AI already do?

A map and a report come earlier. Hammering the slope, reading the outcrop, and signing a hazard do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Geologist

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Maps, sections and a first report.
Estimate

No public source provides a precise figure. This is our estimate.

20%42%+8.4
Process boreholes, GIS and lab.
Estimate

No public source provides a precise figure. This is our estimate.

16%35%+5.6
Field camp, outcrop and sampling.
Estimate

No public source provides a precise figure. This is our estimate.

20%12%+2.4
Read hazard, water and deposit.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
Talk to works, mine or government.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Sign the opinion and own the real ground.
Estimate

No public source provides a precise figure. This is our estimate.

14%16%+2.2
Total100%23%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Maps, sections and a first report
  • Process boreholes, GIS and lab
  • Field camp, outcrop and sampling
  • Read hazard, water and deposit
  • Talk to works, mine or government
  • Sign the opinion and own the real ground
  • geologo
  • geologist

Sources for this job· O*NET 19-2042.00· ESCO/ISCO 2114

PCB technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Gerber, stack-up and the batch.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Etch, drill and the one that drifts.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
AOI, the bridge and stopping.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Assemble, the oven and the one that warps.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The client, the deadline and not skipping AOI.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
The board comes out, and the track whole.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • gerber
  • stack-up
  • AOI
  • drill
  • tracks
  • solder oven
  • bridges
  • PCB batches

Sources for this job· O*NET 51-2022.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 298Dermatologist23%
  2. 299Art director23%
  3. 300Occupational trainer23%
  4. 302Haematologist23%
  5. 303Infectious disease physician23%
  6. 304Labour inspector23%