Automation index
How much of a Geomatics engineer’s job can AI already do?
A point cloud comes earlier. The axis being where it is without signing metres of drift do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geomatics engineer
22%
AI can already do 22% of this job.
#422 / 773
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165
IS WORK OVER?
QA automation engineer
27%
#192 / 773
View rankingQA automation engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Test, the selector and the flake.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 48% | +8.6 |
Pipeline, the green and the one that lies.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Bug, the repro and not closing it blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Data, the environment and not sharing prod.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The developer, the rush and not skipping the one that fails.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Catch the bug, and not painting a lying green.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 27% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- automated tests
- selectors
- flakes
- QA pipelines
- repro
- environments
- lying green
- debug tests
Sources for this job· O*NET 15-1253.00· ESCO/ISCO 2519