IS WORK OVER?

Automation index

How much of a Geomatics engineer’s job can AI already do?

A point cloud comes earlier. The axis being where it is without signing metres of drift do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Security engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Control, the risk and the ticket.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Hole, the patch and the one still open.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Exception, the deadline and not leaving it for ever.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Identity, the privilege and not giving admin out of habit.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The business, the rush and not opening the port 'for a moment'.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Close the hole, and not leaving the exception.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • security controls
  • patches
  • exceptions
  • privileges
  • ports
  • identities
  • not give admin
  • holes

Sources for this job· O*NET 15-1212.00· ESCO/ISCO 2529

Analyse my job

Jobs with similar scores

  1. 419Welding engineer22%
  2. 420Tunnel engineer22%
  3. 421Power engineer22%
  4. 423Railway engineer22%
  5. 424Forestry engineer22%
  6. 425Geotechnical engineer22%