IS WORK OVER?

Automation index

How much of a Geomatics engineer’s job can AI already do?

A point cloud comes earlier. The axis being where it is without signing metres of drift do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Geomatics engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Station, the base and the cloud.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the axis and the one that moved.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Model, the drift and not hiding metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Works, the setting-out and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The contractor, the rush and not signing the drift.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That the axis is there, and not signing metres.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • point clouds
  • total stations
  • axes
  • setting-out
  • drift
  • bases
  • geomatics
  • the field

Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165

Substation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Switching, the sheet and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bay, the earth and not going in without it.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Oil, the analysis and the one that bites.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fault, the disconnector and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Control and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Open the right one, and not going in unearthed.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switching
  • substation sheets
  • earths
  • bays
  • oil
  • lockouts
  • disconnectors
  • not go in unearthed

Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 399Safety engineer22%
  2. 400Welding engineer22%
  3. 401Power engineer22%
  4. 403Railway engineer22%
  5. 404Forestry engineer22%
  6. 405Geotechnical engineer22%