IS WORK OVER?

Automation index

How much of a Geotechnical engineer’s job can AI already do?

A borehole comes earlier. Calling whether the building stands without hiding the clay do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Cloud engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Terraform, the state and the module.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Account, the limit and the one that spikes.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Bucket, the public one and closing it.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Network, the jump and not leaving SSH open to the world.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
FinOps, the bill and not hiding the waste.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
That it does not fall over, and not leaving the bucket public.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%27%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Terraform
  • state
  • buckets
  • cloud accounts
  • SSH
  • bills
  • modules
  • not leave public

Sources for this job· O*NET 15-1241.00· ESCO/ISCO 2523

Analyse my job

Jobs with similar scores

  1. 422Geomatics engineer22%
  2. 423Railway engineer22%
  3. 424Forestry engineer22%
  4. 426Welding inspector22%
  5. 427EV charger installer22%
  6. 428Social integrator22%