IS WORK OVER?

Automation index

How much of a Geotechnical engineer’s job can AI already do?

A borehole comes earlier. Calling whether the building stands without hiding the clay do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

PLC programmer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Ladder, tags and the comment.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Cell, the fault and the one that will not stop.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
E-stop, the cable and not jumping it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Recipe, the change and not dumping production.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The electrician, the terminals and going down to see it.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
That it stops on a fault, and not jumping the e-stop.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • program PLCs
  • tags
  • e-stops
  • faults
  • recipes
  • terminals
  • program comments
  • not jump e-stops

Sources for this job· O*NET 15-1252.00· ESCO/ISCO 2514

Analyse my job

Jobs with similar scores

  1. 395Power engineer22%
  2. 396Railway engineer22%
  3. 397Forestry engineer22%
  4. 399Welding inspector22%
  5. 400EV charger installer22%
  6. 401Social integrator22%