IS WORK OVER?

Automation index

How much of a Geotechnical engineer’s job can AI already do?

A borehole comes earlier. Calling whether the building stands without hiding the clay do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Geotechnical engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Borehole, the sample and the report.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Field, the water table and the one that was not read.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Foundations, the clay and not hiding it.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Slope, the factor and not signing the one that slips.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
The architect, the rush and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

18%18%+3.2
If it stands, sign it. And not hiding the clay.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • boreholes
  • water table
  • clays
  • foundations
  • slopes
  • soil samples
  • geotech reports
  • factors of safety

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142

Substation technician

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Switching, the sheet and the lockout.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bay, the earth and not going in without it.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Oil, the analysis and the one that bites.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Fault, the disconnector and not resetting blind.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Control and not jumping to a yes.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Open the right one, and not going in unearthed.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • switching
  • substation sheets
  • earths
  • bays
  • oil
  • lockouts
  • disconnectors
  • not go in unearthed

Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113

Analyse my job

Jobs with similar scores

  1. 402Geomatics engineer22%
  2. 403Railway engineer22%
  3. 404Forestry engineer22%
  4. 406Welding inspector22%
  5. 407EV charger installer22%
  6. 408Social integrator22%