Automation index
How much of a Geriatric aide’s job can AI already do?
A shift sheet comes earlier. Lifting the one who cannot, and not leaving them alone, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geriatric aide
19%
AI can already do 19% of this job.
#570 / 743
View rankingGeriatric aide
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Shift, the sheet and the diets.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hygiene, the bed and the one who resists.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Transfer, the hoist and not hurting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Eating, the choke and staying on it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The family, the complaint and not arguing in the corridor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Lift them, and not leaving them alone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bed hygiene
- hoist transfer
- choking
- care-home shifts
- pureed diets
- geriatric aide work
- repositioning
- being there
Sources for this job· O*NET 31-1131.00· ESCO/ISCO 5321
IS WORK OVER?
Railway engineer
22%
#396 / 743
View rankingRailway engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Track, geometry and the study.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Points, the blade and the one that will not close.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
OLE, the height and the gauge.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the possession and not leaving the wire wrong.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The operator, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it does not derail, and not signing half-done points.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- track geometry
- points
- OLE
- gauge
- possessions
- blades
- railway studies
- not jump to a yes
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142