Automation index
How much of a Geriatric aide’s job can AI already do?
A shift sheet comes earlier. Lifting the one who cannot, and not leaving them alone, do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Geriatric aide
19%
AI can already do 19% of this job.
#577 / 753
View rankingGeriatric aide
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Shift, the sheet and the diets.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Hygiene, the bed and the one who resists.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Transfer, the hoist and not hurting.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Eating, the choke and staying on it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The family, the complaint and not arguing in the corridor.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Lift them, and not leaving them alone.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bed hygiene
- hoist transfer
- choking
- care-home shifts
- pureed diets
- geriatric aide work
- repositioning
- being there
Sources for this job· O*NET 31-1131.00· ESCO/ISCO 5321
IS WORK OVER?
Substation technician
19%
#660 / 753
View rankingSubstation technician
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Switching, the sheet and the lockout.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Bay, the earth and not going in without it.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Oil, the analysis and the one that bites.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Fault, the disconnector and not resetting blind.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Control and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
Open the right one, and not going in unearthed.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- switching
- substation sheets
- earths
- bays
- oil
- lockouts
- disconnectors
- not go in unearthed
Sources for this job· O*NET 49-2095.00· ESCO/ISCO 3113