IS WORK OVER?

Automation index

How much of a Gilder’s job can AI already do?

A bole comes earlier. Laying gold leaf without seeing the join do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Gilder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Prep, bole and the ground.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Lay, gold leaf and the join.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Burnish, matte and the one that lifts.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Frame, altarpiece and the client who touches.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The humidity, the shop and not laying in a rush.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No visible join, and not eating the gold.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • bole
  • gold leaf
  • burnish
  • joins
  • frames
  • altarpieces
  • matte
  • gilding ground

Sources for this job· O*NET 51-9123.00· ESCO/ISCO 7316

Aerospace engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Calculate, simulate and certify structures and systems.
Estimate

No public source provides a precise figure. This is our estimate.

18%48%+8.6
Drawings, tolerances and traceability.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Bench, test flight and incidents.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Vendors, quality and EASA.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
Documentation, versions and configuration.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Sign something that will not fall.
Estimate

No public source provides a precise figure. This is our estimate.

16%14%+2.2
Total100%25%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Drawings, tolerances and traceability
  • Bench, test flight and incidents
  • Vendors, quality and EASA
  • Documentation, versions and configuration
  • Sign something that will not fall
  • ingeniero aeronautico
  • aerospace engineer

Sources for this job· O*NET 17-2011.00· ESCO/ISCO 2144

Analyse my job

Jobs with similar scores

  1. 489Zookeeper19%
  2. 490Chimney sweep19%
  3. 491Film director19%
  4. 493Cabinetmaker19%
  5. 494Swimming coach19%
  6. 495Tennis coach19%