Automation index
How much of a Gilder’s job can AI already do?
A bole comes earlier. Laying gold leaf without seeing the join do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Gilder
19%
AI can already do 19% of this job.
#501 / 643
View rankingGilder
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Prep, bole and the ground.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Lay, gold leaf and the join.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Burnish, matte and the one that lifts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Frame, altarpiece and the client who touches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The humidity, the shop and not laying in a rush.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No visible join, and not eating the gold.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bole
- gold leaf
- burnish
- joins
- frames
- altarpieces
- matte
- gilding ground
Sources for this job· O*NET 51-9123.00· ESCO/ISCO 7316
IS WORK OVER?
Concrete finisher
19%
#530 / 643
View rankingConcrete finisher
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Set-out, joints and thickness.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Pour, vibrate and float.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Screed, power float and the right moment.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Cure, polythene and the windy day.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The late mixer and the one who wants water.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That it does not crack open, and not adding extra water.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- pour concrete
- vibrate
- float
- shrinkage joints
- power float
- cure
- screed
- slab thickness
Sources for this job· O*NET 47-2051.00· ESCO/ISCO 7114