Automation index
How much of a Gilder’s job can AI already do?
A bole comes earlier. Laying gold leaf without seeing the join do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Gilder
19%
AI can already do 19% of this job.
#501 / 643
View rankingGilder
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Prep, bole and the ground.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Lay, gold leaf and the join.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Burnish, matte and the one that lifts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Frame, altarpiece and the client who touches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The humidity, the shop and not laying in a rush.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No visible join, and not eating the gold.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bole
- gold leaf
- burnish
- joins
- frames
- altarpieces
- matte
- gilding ground
Sources for this job· O*NET 51-9123.00· ESCO/ISCO 7316
IS WORK OVER?
EV charger installer
22%
#350 / 643
View rankingEV charger installer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Single-line, power and the certificate.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Conduit, cable and the board that will not take it.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Configure, app and load balancing.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Residents, the bay and the neighbour who objects.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The electrical inspection and the inspector.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That it charges at night, and not tripping the main.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- EV chargers
- single-line
- load balancing
- electrical certificate
- wire the bay
- charger app
- charge board
- residents
Sources for this job· O*NET 47-2111.00· ESCO/ISCO 7411