Automation index
How much of a Gilder’s job can AI already do?
A bole comes earlier. Laying gold leaf without seeing the join do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Gilder
19%
AI can already do 19% of this job.
#591 / 753
View rankingGilder
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Prep, bole and the ground.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Lay, gold leaf and the join.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Burnish, matte and the one that lifts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Frame, altarpiece and the client who touches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The humidity, the shop and not laying in a rush.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No visible join, and not eating the gold.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bole
- gold leaf
- burnish
- joins
- frames
- altarpieces
- matte
- gilding ground
Sources for this job· O*NET 51-9123.00· ESCO/ISCO 7316
IS WORK OVER?
Geomatics engineer
22%
#402 / 753
View rankingGeomatics engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Station, the base and the cloud.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the axis and the one that moved.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Model, the drift and not hiding metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Works, the setting-out and going down to see it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The contractor, the rush and not signing the drift.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the axis is there, and not signing metres.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- point clouds
- total stations
- axes
- setting-out
- drift
- bases
- geomatics
- the field
Sources for this job· O*NET 17-1022.00· ESCO/ISCO 2165