IS WORK OVER?

Automation index

How much of a Gilder’s job can AI already do?

A bole comes earlier. Laying gold leaf without seeing the join do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Gilder

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Prep, bole and the ground.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Lay, gold leaf and the join.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Burnish, matte and the one that lifts.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Frame, altarpiece and the client who touches.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The humidity, the shop and not laying in a rush.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No visible join, and not eating the gold.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • bole
  • gold leaf
  • burnish
  • joins
  • frames
  • altarpieces
  • matte
  • gilding ground

Sources for this job· O*NET 51-9123.00· ESCO/ISCO 7316

Mining engineer

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Model deposit, blast and rates.
Estimate

No public source provides a precise figure. This is our estimate.

16%40%+6.4
Drawings, permits and mining plans.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
Face, safety and ventilation.
Estimate

No public source provides a precise figure. This is our estimate.

18%14%+2.5
Plant, contractors and output.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Restoration, waste and regulation.
Estimate

No public source provides a precise figure. This is our estimate.

18%16%+2.9
Not leaving a miner below.
Estimate

No public source provides a precise figure. This is our estimate.

16%12%+1.9
Total100%22%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • Model deposit, blast and rates
  • Drawings, permits and mining plans
  • Face, safety and ventilation
  • Plant, contractors and output
  • Restoration, waste and regulation
  • Not leaving a miner below
  • ingeniero de minas
  • mining engineer

Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2146

Analyse my job

Jobs with similar scores

  1. 489Zookeeper19%
  2. 490Chimney sweep19%
  3. 491Film director19%
  4. 493Cabinetmaker19%
  5. 494Swimming coach19%
  6. 495Tennis coach19%