Automation index
How much of a Gilder’s job can AI already do?
A bole comes earlier. Laying gold leaf without seeing the join do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Gilder
19%
AI can already do 19% of this job.
#583 / 743
View rankingGilder
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Prep, bole and the ground.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Lay, gold leaf and the join.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Burnish, matte and the one that lifts.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Frame, altarpiece and the client who touches.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The humidity, the shop and not laying in a rush.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No visible join, and not eating the gold.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- bole
- gold leaf
- burnish
- joins
- frames
- altarpieces
- matte
- gilding ground
Sources for this job· O*NET 51-9123.00· ESCO/ISCO 7316
IS WORK OVER?
Site engineer
19%
#598 / 743
View rankingSite engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Setting-out, axes and the level.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Rebar, cover and the one that is missing.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Concrete, the slump and not pouring if it fails.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Note, the diary and not dressing the delay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The site manager, the rush and not covering bad steel.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
That the column is there, and not covering the steel.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- setting-out
- axes
- rebar
- cover
- slump
- site diary
- levels
- not cover steel
Sources for this job· O*NET 17-2051.00· ESCO/ISCO 2142