Automation index
How much of a Glassblower’s job can AI already do?
A stock gather comes earlier. Gathering, blowing without leaving stress in the piece do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Glassblower
19%
AI can already do 19% of this job.
#557 / 643
View rankingGlassblower
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Furnace, pipe and the gather.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Blow, shape and the one that drops.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Anneal, cut and the stresses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Order, the colour and the one that misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The heat, the rhythm and not rushing the anneal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No stress, and not leaving it raw.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- gather glass
- blow
- pipe
- anneal
- stresses
- glass furnace
- glass moulds
- cut the cane
Sources for this job· O*NET 51-9195.00· ESCO/ISCO 7315
IS WORK OVER?
Bus driver
15%
#630 / 643
View rankingBus driver
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Run sheet, logs and clocking.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Drive the route or the charter.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Stops, accessibility and fare or validation.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 10% | +1.8 |
Incidents, diversions and passenger care.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
Pre-trip check and defect reports.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 18% | +2.5 |
Shifts, fatigue and driving rules.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 15% | +2.1 |
| Total | 100% | 15% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- drive
- route
- load goods
- Run sheet, logs and clocking
- Drive the route or the charter
- Incidents, diversions and passenger care
- Pre-trip check and defect reports
- Shifts, fatigue and driving rules
- conductor de autobus
- bus driver
Sources for this job· O*NET 53-3052.00· ESCO/ISCO 8331