IS WORK OVER?

Automation index

How much of a Glassblower’s job can AI already do?

A stock gather comes earlier. Gathering, blowing without leaving stress in the piece do not.

This percentage does not predict how many people will lose their jobs.

Task comparison

Glassblower

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Furnace, pipe and the gather.
Estimate

No public source provides a precise figure. This is our estimate.

16%32%+5.1
Blow, shape and the one that drops.
Estimate

No public source provides a precise figure. This is our estimate.

22%8%+1.8
Anneal, cut and the stresses.
Estimate

No public source provides a precise figure. This is our estimate.

16%22%+3.5
Order, the colour and the one that misses.
Estimate

No public source provides a precise figure. This is our estimate.

16%28%+4.5
The heat, the rhythm and not rushing the anneal.
Estimate

No public source provides a precise figure. This is our estimate.

16%18%+2.9
No stress, and not leaving it raw.
Estimate

No public source provides a precise figure. This is our estimate.

14%12%+1.7
Total100%19%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • gather glass
  • blow
  • pipe
  • anneal
  • stresses
  • glass furnace
  • glass moulds
  • cut the cane

Sources for this job· O*NET 51-9195.00· ESCO/ISCO 7315

Cloud architect

Where the time goes

Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.

The time saving for each task is estimated separately.

TaskShareAIPoints
Diagrams, ADRs and a first IaC pass.
Estimate

No public source provides a precise figure. This is our estimate.

22%48%+10.6
Cost estimate, Well-Architected and gaps.
Estimate

No public source provides a precise figure. This is our estimate.

18%40%+7.2
Review PRs, security and network.
Estimate

No public source provides a precise figure. This is our estimate.

16%20%+3.2
Align with security, finops and product.
Estimate

No public source provides a precise figure. This is our estimate.

16%15%+2.4
PoCs, real failures and vendor limits.
Estimate

No public source provides a precise figure. This is our estimate.

14%18%+2.5
Sign the design and own the incident.
Estimate

No public source provides a precise figure. This is our estimate.

14%14%+2
Total100%28%

Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low

Skills and activities

  • building plans
  • renders
  • sign a project
  • Diagrams, ADRs and a first IaC pass
  • Cost estimate, Well-Architected and gaps
  • Review PRs, security and network
  • Align with security, finops and product
  • PoCs, real failures and vendor limits
  • Sign the design and own the incident
  • arquitecto cloud

Sources for this job· O*NET 15-1243.01· ESCO/ISCO 2511

Analyse my job

Jobs with similar scores

  1. 544Tractor driver19%
  2. 545Stagehand19%
  3. 546Valet19%
  4. 548Stained-glass artist19%
  5. 549Cobbler19%
  6. 550Dog trainer18%