Automation index
How much of a Glassblower’s job can AI already do?
A stock gather comes earlier. Gathering, blowing without leaving stress in the piece do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Glassblower
19%
AI can already do 19% of this job.
#676 / 763
View rankingGlassblower
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Furnace, pipe and the gather.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Blow, shape and the one that drops.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Anneal, cut and the stresses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Order, the colour and the one that misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The heat, the rhythm and not rushing the anneal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No stress, and not leaving it raw.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- gather glass
- blow
- pipe
- anneal
- stresses
- glass furnace
- glass moulds
- cut the cane
Sources for this job· O*NET 51-9195.00· ESCO/ISCO 7315
IS WORK OVER?
District heating engineer
22%
#407 / 763
View rankingDistrict heating engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Balance, flows and the loss.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Chamber, the leak and the one that weeps.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Substation, the valve and the one that will not open.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Winter, the last block and not leaving it cold.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The council, the tariff and not hiding the loss.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
That the heat arrives, and not hiding the loss.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- heat balances
- flows
- network losses
- chambers
- heat substations
- the last block
- tariffs
- leaks
Sources for this job· O*NET 17-2199.00· ESCO/ISCO 2149