Automation index
How much of a Glassblower’s job can AI already do?
A stock gather comes earlier. Gathering, blowing without leaving stress in the piece do not.
This percentage does not predict how many people will lose their jobs.
Task comparison
IS WORK OVER?
Glassblower
19%
AI can already do 19% of this job.
#656 / 743
View rankingGlassblower
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Furnace, pipe and the gather.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 32% | +5.1 |
Blow, shape and the one that drops.EstimateNo public source provides a precise figure. This is our estimate. | 22% | 8% | +1.8 |
Anneal, cut and the stresses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
Order, the colour and the one that misses.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
The heat, the rhythm and not rushing the anneal.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 18% | +2.9 |
No stress, and not leaving it raw.EstimateNo public source provides a precise figure. This is our estimate. | 14% | 12% | +1.7 |
| Total | 100% | 19% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- gather glass
- blow
- pipe
- anneal
- stresses
- glass furnace
- glass moulds
- cut the cane
Sources for this job· O*NET 51-9195.00· ESCO/ISCO 7315
IS WORK OVER?
Geotechnical engineer
22%
#398 / 743
View rankingGeotechnical engineer
Where the time goes
Task weights are our estimates based on O*NET frequency data, not time shares published by O*NET.
The time saving for each task is estimated separately.
| Task | Share | AI | Points |
|---|---|---|---|
Borehole, the sample and the report.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 40% | +6.4 |
Field, the water table and the one that was not read.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 14% | +2.5 |
Foundations, the clay and not hiding it.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 28% | +4.5 |
Slope, the factor and not signing the one that slips.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 22% | +3.5 |
The architect, the rush and not jumping to a yes.EstimateNo public source provides a precise figure. This is our estimate. | 18% | 18% | +3.2 |
If it stands, sign it. And not hiding the clay.EstimateNo public source provides a precise figure. This is our estimate. | 16% | 12% | +1.9 |
| Total | 100% | 22% |
Modelled workweek: 100% · Public evidence: 0% · Estimate: 100% · Confidence: Low
Skills and activities
- boreholes
- water table
- clays
- foundations
- slopes
- soil samples
- geotech reports
- factors of safety
Sources for this job· O*NET 17-2151.00· ESCO/ISCO 2142